Conservation in action: Rum Hospital's verandah and columns
BY MICHAEL ELLIS AND MARIA ELENA RUGGERI THURSDAY 9 SEPTEMBER 2021
This building was constructed between 1811 and 1816 as the south wing of the general hospital (known as the ‘Rum Hospital’). Along with the central block of NSW Parliament House (the north wing of the former hospital), it is the oldest surviving public building in Sydney. The simple, symmetrical two-storey design has a colonnaded verandah on both levels. The ground floor verandah and columns were constructed of stone and the first-floor verandah and columns of timber.
Originally providing residential quarters for the assistant surgeon and other staff, the building was later converted with a formal arrangement of additional buildings around a central secure courtyard into the Sydney Branch of the Royal Mint (1854-1926). The Mint site is now the headquarters of Sydney Living Museums.
The building has undergone alterations during its long history. In the late 1970s it was restored by the Government Architect’s Branch Historic Buildings Group. The conservation works included the replacement of the stone columns on the ground-floor verandah and the timber verandah and columns on the first floor. The chinoiserie timber lattice balustrade was also reconstructed, based on documentary and physical evidence.
As part of Sydney Living Museums’ capital maintenance program, structural repairs to and conservation of the timber verandah and columns are underway. This important heritage work will include the replacement of the column on the south-west corner, the repair of deteriorated column and verandah sections, and the repainting of all columns with a traditional linseed ‘sand paint’. This type of paint was traditionally used in the late 19th century to simulate the appearance of stone.

Old section of Rum Hospital column base skirt showing remnant of sand paint, Museums Discovery Centre.

Old section of Rum Hospital capital, Museums Discovery Centre.

Detail of framing below column three, showing the degree of deterioration.

South-west corner of Rum Hospital building after removal of verandah framing.

Continuation of the ground floor stone and first floor timber column at south-west end of Rum Hospital building.

South-west end of Rum Hospital building showing top sections of columns to be repaired.

Column with rotted lower section removed and scaffold bracing and supporting top section.

New hardwood column ready for instalment on southwest corner of verandah.
More heritage & conservation news
Conservation
How to manage mould in our homesMonday 21 March 2022
To help you manage mould at home, we’re sharing insights into how we manage mould in our house museums and some tips you can use to tackle mould at your house.
Conservation
Conservation in Action: Vaucluse House turrets completeFriday 19 March 2021
After an extraordinary few months we have completed the re-construction of the stone turrets at Vaucluse House.
Conservation
Conservation in Action: Woolshed Conservation Works updateTuesday 2 March 2021
Structural repair works are well underway in the Woolshed at Rouse Hill.
Conservation
Conservation in action: The turret stone has arrived! Wednesday 2 December 2020
We were very excited to receive the beautiful new replacement stone for the turrets at Vaucluse House this week.
Conservation
Woolshed conservation: removing the collectionMonday 24 August 2020
Over recent months the first stage of a major conservation project in the woolshed at Rouse Hill Estate has been underway.